Transport
Efficient Design
Envelope and Equipment Features
Efficiency
Renewables
Electrification
Transport
Electric Vehicle Charging
EV Readiness
Light Duty Vehicles
Medium and Heavy Duty Vehicles
Operational Emissions
Performance Information and Improvement
Audits
Benchmarking
Building Performance Standards
Time of Sale/Date-Certain
Embodied Carbon
Low Carbon Materials
Manufacturing
Procurement
Demolition
Recycling and Reuse
ENERGY PLUS WATER
Indoor and Outdoor Water Efficiency
Right-sizing Plumbing
Water Reuse
Water Neutral Development
Single Family Air Conditioner Replacements (SF AC to HP)
- Helps accelerate heat pump adoption
- Eliminates site GHG emissions associated with space heating
- Some existing site conditions may present implementation challenges
- Requires significant stakeholder education on benefits
View and Download Resources
Application Package, Internal Staff Resources, Implementation
Application Package
Internal Staff Resources
Nonresidential Air Conditioner Replacements (NR AC to HP)
Require heat pump or efficiency measures when replacing packaged rooftop air conditioners in nonresidential buildings.
- Encourages installation of heat pumps when replacing HVAC systems.
- Applies only to HVAC systems with capacity less than 20 tons
View and Download Resources
Application Package, Internal Staff Resources, Implementation
Application Package
Internal Staff Resources
Pre-wire stove, HVAC and clothes dryer for 240V service
To facilitate the future electrification of gas equipment in mixed-fuel projects, install dedicated 240 volt circuits to enable conversion for each gas terminal or stub out to electric heaters, clothes dryers, and ranges/ovens
- Prepare for likely future retrofit. Very small incremental cost at new construction
- No direct energy savings associated with enabling measures
- Uncertainty regarding future benefits
View and Download Resources
Application Package, Internal Staff Resources, Implementation
Internal Staff Resources
Implementation
Conduit to each area with gas equipment sized to serve electrical equipment with equivalent capacity
To facilitate the future electrification of gas equipment in mixed-fuel projects, require installation of raceways sized for conductors adequate to serve the building’s potential electric loads
- Prepare for likely future retrofit
- Small incremental cost at new construction
- Uncertainty regarding future benefits
- No direct energy savings associated with enabling measures
View and Download Resources
Application Package, Internal Staff Resources, Implementation
Implementation
Upgrade electrical panel with sufficient capacity to serve electrical equipment and appliances, and electric vehicle
Electrical panels and subpanels serving common loads in a mixed-fuel building shall have space for overcurrent protective devices and bus bars of adequate capacity to meet potential future electrical requirements
- Prepare for possibility of electric vehicle purchase and other retrofits
- Likely only required in older home vintages
- No direct energy savings associated with enabling measures
View and Download Resources
Application Package, Internal Staff Resources, Implementation
Implementation
Regulation of building or appliance emissions
Los Altos Hills
- Utilizes Clean Act Act authority
- Regulates all emitting equipment
- Direct air quality/health benefits
- High impact on emissions reductions
- Legally untested
View and Download Resources
Application Package, Internal Staff Resources, Implementation
There are no resources for this requirement.
Contact us for more information.
Learn more about the Reach Code Process.
Sorry
Sorry, but there were no matching elements found.
Sorry
Sorry, but there were no elements found at all.